Dashboard · Shop Floor
Production Schedule
Active jobs, committed install dates, and capacity.
How this page works (click to expand)
  • KPI bar: Active = jobs with committed install dates. Awaiting EOJ = installed but actuals not yet logged. Variance = predicted vs actual hours (target +/- 20%). Charlie attendance = % of installs you're on (trend down as crew grows).
  • Awaiting EOJ: Per Lee's rule, no job is closed until actuals are logged. Click "Log actuals" to enter the per-person hours for that job.
  • Active schedule: Each job shows install date, days out, predicted/committed hours, travel, the next production-step deadline, and any flags (HARD = customer-driven, SPECIAL = special-order materials, EXPEDITE = lead-time shortfall accepted).
  • Cadence: Wednesday installs by default. Production Mon-Tue afternoons. Friday is review/entrepreneur day -- no install proposals on Fri/Sat/Sun. See context/charlie-weekly-schedule.md for full cadence.
  • WIP caps: max 2 production jobs concurrent, max 1 install per day. Settings can be changed in tools/maestro-dashboard/data/production_config.json (settings page coming).
  • Add a job: "+ New job on schedule" (top of page) walks through intake. "Shop board" is the dark-theme display for shop monitors.
Active jobs
7
on schedule
Awaiting EOJ
7
closed, actuals not logged
Closed (logged)
0
in history
Manufacturing variance
--
target ±20%
Install variance
--
target ±20%
Charlie attendance
--
trend down as crew grows
Awaiting EOJ (7)
Jobs that have completed install but actuals haven't been logged. EOJ-on-close is non-negotiable per Lee's framework.
Job Category Installed Predicted Manufacturing / Install
2632 - Sunso Lot 18 standard_closet Thu 7/2/2026 3.16h / 5.13h Log actuals
2642 - Wise standard_closet Fri 7/3/2026 3.84h / 6.24h Log actuals
2633 - Sunso Lot 19 standard_closet Wed 7/8/2026 3.28h / 5.33h Log actuals
2657 - Gulati standard_closet Thu 9/24/2026 4.26h / 6.22h Log actuals
2654 - Koniniec standard_closet Wed 9/30/2026 16.56h / 17.48h Log actuals
2638 - Martin standard_closet Wed 10/7/2026 4.3h / 4.94h Log actuals
2646 - Gilbert standard_closet Fri 10/16/2026 5.1h / 8.25h Log actuals
Active schedule (7)
WIP caps: max 2 concurrent in production, max 1 install/day. Worst-case crew assumption: charlie solo.
Job Category Install date Days out Predicted (Manufacturing / Install) Travel Next step Flags
2632 - Sunso Lot 18 standard_closet Thu 7/2/2026 Past due 3.2h / 5.1h 46 min -- EXPEDITE Reschedule
2642 - Wise standard_closet Fri 7/3/2026 Past due 3.8h / 6.2h 6 min -- EXPEDITE Reschedule
2633 - Sunso Lot 19 standard_closet Wed 7/8/2026 Past due 3.3h / 5.3h 46 min -- EXPEDITE Reschedule
2657 - Gulati standard_closet Thu 9/24/2026 Past due 4.0h / 4.0h 35 min -- HARD EXPEDITE Reschedule
2654 - Koniniec standard_closet Wed 9/30/2026 Past due 13.0h / 16.0h 36 min -- EXPEDITE Reschedule
2638 - Martin standard_closet Wed 10/7/2026 Past due 4.3h / 8.0h 43 min -- HARD EXPEDITE Reschedule
2646 - Gilbert standard_closet Fri 10/16/2026 Past due 5.1h / 8.3h 117 min -- HARD Reschedule